Start mining with
the largest data-center in CIS

play

KAZAKHSTAN AT
A GLANCE:

  • 1
    Ideal shipping location
  • 2
    4000 MW surplus electricity
  • 3
    Optimal climate for air cooling
  • 4
    Fully legalized mining
  • 4
    High World Bank Doing
    Business ranking
1

GEOGRAPHIC ADVANTAGES

LOGISTICS
LOGISTICS

Logistical proximity to ASIC manufacturers in China enable fast, cost-effective shipments

Low import VAT (12%)
VAT-free import options

4000 MW power surplus in the countryis incentive upon power producers and local governments to support domestic power consumers such as data-centers

LEGALITY
LEGALITY

“A recent bill, which was approved by the Kazakh Senate and signed into law legalizes mining, saying that people involved indigital mining are obliged to inform the authorities about their activities. It also stresses that miners are the legal owners of the digital assets they produce.

CLIMATE
CLIMATE

“Kazakhstan is located in an optimal location for mining. The climate is cool...”

3

Max. average summer
temperature in Pavlodar: 28°C (82°F)

EXPERIENCED TEAM

4 years of experience designing, building and operating mining facilities

QUALIFIED SPECIALISTS

  • Completed training at Bitmain manufacturing plants
  • Invited specialists from other manufacturing plants to conduct training at our facilities
  • High level of qualification enables onsite equipment repairs
  • Ongoing qualification improvement through training 
  • Advanced diagnostics and monitoring system 

GOVERNMENT SUPPORT

  • Ekibastuz city administration granted Enegix ownership of a 15 HA land plot for construction and operation of our data-center
  • KEGOC granted Enegix access to its electric distribution substation, and gives prompt assistance with procuring the permitting and technical documentation required for construction.
Enegix Roll shutters for air flow control
Enegix Two 125,000 kVA Toshiba Transformers
Enegix 220 kV Overhead Line, Enegix Substation

180 MW DATA-CENTER

One of the Largest Data-Centers in the World

Enegix
  • Privately owned 15 ha land plot 
  • Over 24M USD invested in construction and high-voltage infrastructure
  • 150 MW Power Purchase Agreement
  • Personnel: 160 total; 100 operators of different categories, 12 electricians
  • Video surveillance and armed security
  • On-site ASIC repair, on-site personnel accommodation
Enegix
play
180MW Facility Tour and Technical Description

HOSTING

ALL-IN HOSTING INCLUDES:

  • Data-center shelf space with individual power meters
  • Main and standby internet connection
  • Air cooling designed to maintain constant temperature
  • Armed security and video surveillance of data-center facilities
  • VAT

CONTRACTUAL GUARANTEES:

  • 98.5% min uptime
  • 97.5% min hashrate

ADDITIONAL SERVICES

  • ASIC sourcing
  • Crypoto conversion
  • Legal consultation 
  • Onsite AISC repair

Expansion roadmap

30 MWT
Current Data Center
180 MWT
180 МВТ Commisionning September 2020
500 MWT
Expansion 2021 +500 MW